PFC Services - CSE Structure Condition Assessment
CSE Structure Condition Assessment
Walk-Through Inspection
- Fully trained confined space & rescue man-entry team to survey trunk sewers, tunnels, or culvert sizes in excess of 1500mm diameter
- Ability to support vertical depths in excess of 30 meters
- Survey information captured is essential in determining structural and service condition of pipelines
- Identify and locate cross connections, overflows, corrosion and blockages
Maintenance Hole Condition Assessment
- Deteriorated manholes account for a significant volume of inflow and infiltration that may cause sewer overflows
- Perform manhole entry to conduct assessment of maintenance hole conditions
- Formal maintenance hole report with schematic plan, elevation dimensions and digital photos
- Manhole rehabilitation to remove and replace ladder rungs, landings, safety grates including complete refurbishment
- MH Condition Assessment.pdf (30 kB)
Asset Management & Condition Assessment
- Specialized tools to assist consultants in specialized site specific plan and remediation action
- Coring sampling to confirm depth verification
- Large diameter sonde detection
- Infiltration testing
- Debris sampling
- Water sampling
- GPR assistance and support
- Install and monitor inflatable plug from 150mm to 1500mm diameter
- Design and build temporary bulkheads